Member is responsible for providing a cleared right-of-way. Overhead Line Extension
Single-Phase: 4.85 per foot *Plus $800.00 construction fee Three-Phase: $10.50 per foot
$340 plus tax for a meter pole. .
Underground Line Extension
Member is responsible to provide 4ft deep trench. Single-Phase: 8.00 per foot Three-Phase: $15.00 per foot Padmount Transformer Charge Single-Phase: $500 Three-Phase: $3,000
*No underground will be installed between December 1st to April 1st
Overhead to underground conversion fee:
Single-Phase: $800 Three-Phase: $2,400
$250 plus tax for a pole pedestal.
$425 plus tax for a 200A free standing meter pedestal. $883.55 plus tax for a 400A free standing meter pedestal.
Member is responsible for installing, maintaining and locating secondary conductor from pedestal to house.
Trenching: $200.00 plus $1.25 per foot (where feasible)
Plowing: $400.00 plus $ .40 per foot (where feasible)
Service Drops The Cooperative will construct up to 150 feet of overhead secondary to metering point at no charge. The charge for overhead service drops longer than 150 feet is $1.50 per foot.
Underground service drops are the responsibility of the member. Member is responsible for installing, maintaining and locating secondary conductor from meter to house.
Credit
All contribution in aid of construction, other than underground conversion and transformer charges, are refundable at a 3.7¢ per kilowatt hour credit on your monthly bill once the service is connected. This will continue for three years or until contribution is fully refunded, whichever comes first.
Other Costs
Consumer Deposit - based on one month’s usage. May be waived if we receive an acceptable letter of credit from your current utility.
Prices subject to change without notice.
|